Expired
Milestone
Jan 22, 2024–Feb 9, 2024
Sprint #1
Sprint #1 (closed)
The first sprint of the project.
Goal: Design the basic needs for the project (classes, Wireframes, ect.)
Loading
Loading
Loading
Loading
Sprint #1 (closed)
The first sprint of the project.
Goal: Design the basic needs for the project (classes, Wireframes, ect.)